Lost Souls Update: 4/28/16
Moved to the freezers and knocked them out decently fast, though I may mess around with the textures a little more later on. Now I’m...


Lost Souls Update: 4/25/16
Finished texturing the stuff for the main counter, and started modeling/texturing stuff for the coolers inside. Modeling went fast, so I...


Lost Souls Update: 4/18/16
Made a lot of progress on the interior of the Gas Station, textured everything on the side counter, and have been working on the stuff...


Lost Souls Update: 4/11/16
Been working on the interior of the gas station, made some good progress. Started texturing various items such as the pop and icee...


Lost Souls Update: 4/4/16
Making more progress on the gas station, the texture outside are basically done though I may tweak things here and there. But I’m moving...


Lost Souls Update 3/14/16
Worked on some texturing for the building, along with redoing the roof for the Gas Station. Wasn't really enjoying the original look, so...